Auckland Jobs |
Canterbury Jobs |
Northland Jobs |
Otago Jobs |
Southland Jobs |
Tasman Jobs |
Wellington Jobs |
West Coast Jobs |
Auckland Jobs |
Canterbury Jobs |
Northland Jobs |
Otago Jobs |
Southland Jobs |
Tasman Jobs |
Wellington Jobs |
West Coast Jobs |
Oil & Gas Jobs |
Banking Jobs |
Construction Jobs |
Top Management Jobs |
IT - Software Jobs |
Medical Healthcare Jobs |
Purchase / Logistics Jobs |
Sales |
Ajax Jobs |
Designing Jobs |
ASP .NET Jobs |
Java Jobs |
MySQL Jobs |
Sap hr Jobs |
Software Testing Jobs |
Html Jobs |
Job Location | Kincardine, ON |
Education | Not Mentioned |
Salary | Not Disclosed |
Industry | Not Mentioned |
Functional Area | Not Mentioned |
Job Type | Full Time |
Why join usSNC-Lavalin provides cutting-edge engineering, procurement, construction and financing solutions to projects in more than 100 countries around the world. From the Canadian Arctic to the Southern African region and Australasia, our multicultural workforce is driven by a fierce pride in their work and a pioneering vision.SNC-Lavalin is truly a global leader in its field and has been chosen to design and build some of the most prestigious projects in the world.The Shoreline Power Group is a Joint Venture of Aecon, AECOM and SNC-Lavalin. Shoreline Power Group will be completing the Fuel Channel and Feeder Replacement (FCFR) project. The joint venture has been awarded a contract by Bruce Power to execute the Unit 6 FCFR at the Bruce Nuclear Generating Station in Kincardine, Ontario.This project is part of Bruce Power’s Life Extension Program, which will allow Bruce Power’s CANDU units to continue to operate safely through to 2064, the project is the centerpiece of the Major Component Replacement (MCR) program to replace the main components of the reactor. Unit 6 is the first of six reactors being replaced by Bruce Power through the MCR program.The scope of work includes the removal and replacement of calandria tubes, pressure tubes, and feeders for Unit 6, as well as construction management and trade labour. Work is scheduled to commence in June 2020, with expected completion in the third quarter of 2022. Shoreline is a preferred supplier and has the potential for five similar projects on the remaining five reactors.Reporting to the Document Control Lead, the Document Control Administrator is responsible for the processing, issuing and/or reproduction and filing of engineering and construction documents to insure accuracy and timeliness.How will you contribute to the teamTo perform this role successfully, the candidate will be responsible for but not limited to the following: